搜索
JY

How to install the explosion-proof plate?

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-10-13
  • Views:0

(Summary description)Explosion-proof board, as we can see from the name, is a building material that prevents explosion and leakage. It is generally used in places with explosion hazards to ensure people's safety, such as chemical plants, pharmaceutical factories, and other places with potential safety hazards. Next, let's take a look at the construction process of the explosion-proof board!

How to install the explosion-proof plate?

(Summary description)Explosion-proof board, as we can see from the name, is a building material that prevents explosion and leakage. It is generally used in places with explosion hazards to ensure people's safety, such as chemical plants, pharmaceutical factories, and other places with potential safety hazards. Next, let's take a look at the construction process of the explosion-proof board!

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-10-13
  • Views:0
Information

 

Explosion-proof board, as we can see from the name, is a building material that prevents explosion and leakage. It is generally used in places with explosion hazards to ensure people's safety, such as chemical plants, pharmaceutical factories, and other places with potential safety hazards. Next, let's take a look at the construction process of the explosion-proof board!

   Explosion-proof board construction technology:

   1. Installation method

(1) According to the roof C-shaped steel spacing (approximately 1500mm), weld a 50×50×3 (mm) square tube in the direction perpendicular to the C-shaped steel. It is flush, and a square tube is arranged at a distance of 400mm along the vertical direction of the Z-shaped steel.

(2) After the square pipe grid is welded firmly, install the first layer of 1200×2400×10mm explosion venting plate on the square pipe, and the screws are fixed on the square pipe with a distance of 200mm. In place, both boards must be installed with screws, and the screws sink 1mm into the surface of the board. After the installation of the *** layer board is completed, install the second layer of explosion venting board. The double-layer staggered seam arrangement of the second layer and the *** layer board is greater than 600mm.

   (3) The joints are sealed with structural glue.

Keyword:

Scan the QR code to read on your phone

relevant information

Previous page
1
2
4